15 years focus on the development and production of slurry filters and wastewater treatment

banner

Current page:

Home

/

Case

/

Precautions for Water Pump Operation in Sewage Treatment Station

Case

Contact Us

Tel:

+86-757-8633-0278

Email:doyen@doyenchina.com

Fax:+86-757-86287390

Address:Room 201, Building No. 24, Yicui Rose Garden, No. 2, Jihua 7 Road, Chancheng District, Foshan City, Guangdong Province, China 528000.

Precautions for Water Pump Operation in Sewage Treatment Station

      Precautions for Water Pump Operation in Sewage Treatment Station:

  1. Maintenance work is strictly prohibited when the equipment is in electrified operation.
  2. Do not close the water pump inlet valve, except for normal maintenance.
  3. No aerial work, repair of lighting fixtures or handling equipment shall be carried out without adequate protective facilities.
  4. Refuse and waste shall not be discarded into the pool and pipe gallery.
  5. For non-special work, do not climb over the pool railing to avoid danger.
  6. When the pool is to be repaired, there must be protection personnel beside it, and the work shall not be carried out alone.
  7. Paying attention to the protection of all kinds of processing equipment, do not place articles or talk on the equipment.

  1. Pay attention to protect all kinds of measuring instruments to prevent collision.
  2. When using a ladder for operation, the ladder must be fixed, and must be accompanied by other staff, not for operation.
  3. When using the hose, do not throw it directly into any processing unit, and hang it on the hook immediately after use.

      Doyen specializes in providing belt press equipment for the Southeast Asian market. Welcome to visit our workshop and formulate a more scientific  plan based on the actual situation of your company. Welcome to visit joyce@doyenchina.com or visit https://www.doyenchina.com.

Feb-09-2021

admin

Technical Support: Magic Lamp