Talk about how the manufacturer conducts debugging after installing the filter press?

      Our company is a professional manufacturer of belt filter presses, occupying a broad market with excellent service quality and product quality. How to install and debug the filter press?

The foundation structure should be designed by the construction engineers according to the equipment load conditions, and the anchor bolts should be grouted twice with the reserved holes.

In hydraulic filter press, clean 20#-40# hydraulic mechanical oil is injected into the oil tank of the hydraulic station, and the operating temperature is >-5℃; if the ambient temperature is low, hydraulic oil with similar viscosity and low freezing point can be selected. Hydraulic oil must be added through 80-100 mesh filter.

The mechanical or hydraulic pressing device should work correctly when the power is turned on and the starter motor is connected. The pressure gauge should rise steadily during hydraulic compression and pressurization, and the hydraulic system has no leakage phenomenon. Correctly adjust the working pressure of the hydraulic station according to the size of the model. If the oil tank is found to be insufficient after the test machine, it must be supplemented.

There should be enough space for operation and maintenance around the filter press. The hydraulic pressure filter press should choose an appropriate position to place the hydraulic station to ensure that the hydraulic station can work normally.

The filter press should be installed on a flat concrete foundation. The thrust plate machine foot at the feed end is fixed on the foundation with anchor bolts; the support end does not need anchor bolts, or the anchor bolts are positioned and locked with two nuts, leaving a proper gap between the nut washer and the machine foot base. The machine feet can be slightly retracted. Before positioning, the installer should correct the verticality of the beam and the large plane of the thrust plate.

Put the filter plate according to the work requirements, and arrange the feeding, washing and draining pipelines. Equipped with a filter pressure indicator and a return channel to control the filter pressure. If it is a diaphragm squeeze type, a compressed air pipeline is arranged.